Supply lines

Expansion of FTTC fiber optic network Alsdorf

Year of construction: 2016
Construction volume: approx. 6,500 m of cable trench
Duration: 4 months

Description:
Production of cable trenches and assembly pits as well as various assembly work and cable pulling work

Expansion of the FTTC fiber optic network at Neu-Pier

Year of construction: 2016
Construction volume: approx. 700 m
Duration: 4 weeks

description:
Construction of cable trenches and assembly pits including surface restoration, renewal of water pipes and house connections

Expansion of the FTTC fiber optic network in Kirchberg

Year of construction: 2016
Construction volume: 900 m
Duration: 5 weeks

Description:
Production of cable trenches and assembly pits including surface restoration

Expansion of the FTTC fiber optic network in Siersdorf

Year of construction: 2016
Construction volume: approx. 850 m
Duration: 4 weeks

Description:
Construction of cable trenches including surface restoration and implementation of soil pressure


Renewal of the power lines

Year of construction: 2016
Construction volume: 360 m
Duration: 3 weeks

description:
Construction of cable trenches including surface restoration and implementation of a horizontal drilling

Framework contract for troubleshooting and house connections

Year of construction: 2014
Construction project: Linnich area, Jülich (house connections)
Würselen room, Übach-Palenberg (troubleshooting)
Duration: 2-year contract

Building description:
Repair contract and house connections



Empty pipe laying

Year of construction: 2013
Construction project: Jülich-Kirchberg
Construction volume: 3200 m
Duration: 2.5 months

Building description:
Laying a cable protection pipe DN 100, pulling in multiple pipes made of PE and blowing in speed-pipe tubes afterwards



Cable laying

Year of construction: 2013
Construction project: Alsdorf-Höngen, Mariadorf and Warden
Construction volume: 2,500 m
Duration: 2.5 months

Building description:
Laying cables - from control cables to 20 KV - and establishing house connections



Framework agreement for troubleshooting

Year of construction: 2012/2013
Construction project: Bergheim, Bedburg, Kerpen, Düren district and the Aachen region
Duration: 1 year + extension by 3 months

description:
Creation of assembly pits with various surfaces, replacement of KVZ cabinets




Expansion of the FTTC fiber optic network

Year of construction: 2011/2012
Construction project: Langerwehe-Schlich, Merode, Hamisch, Heistern
Duration: 2 months

description:
Laying of empty conduits for fiber optic lines, production of head holes for the power connection, installation of KVZ housings




Expansion of the FTTC fiber optic network

Year of construction: 2011
Construction project: Huchem-Stammeln, Sehlhausen
Duration: 2 months

description:
Laying of empty conduits for fiber optic lines, production of head holes for start / target pits and power connections, construction of KVZ housings